NRC WWS’s recent project involved an all in one installation of an inversion dual bladder system. The process began with a 150mm rodding eye, extending 95 meters to a buried chamber. The installation transitioned to a 225mm diameter line, also spanning 95 meters
8” X 2’ Internal sectional point repairs – SpeedyLight+
NGI was at Hyundia and tasked with a super high profile repair. The NGI Team executed flawlessly seventeen 8” X 2’ Internal sectional point repairs in one day.
During the beginning of 2024 DrainTec Solutions’ Lining Division had nearly 600 no-dig point repair patches installed and almost 1000m of CIPP UV cured liner inserted.
A recent job completed at a school in London the pipe was leaking into the reception area installing a UV LED LeakTight impregnated liner to seal the defective pipework.